fieldhouse-complex-2-lg
View from the Plattsburgh State Fieldhouse, overlooking the soccer field
Date: 10/05/07
View from the Plattsburgh State Fieldhouse, overlooking the soccer field
fieldhouse-complex-1-lg
Plattsburgh State Fieldhouse
Date: 10/05/07
Plattsburgh State Fieldhouse
BaseballPressBoxWeb
Chip Cummings Field added a pressbox, with a film deck, for the 2007 season. The new building includes seating for print/electronic media, public address announcer, music operator and scoreboard operator.
Date: 05/23/08
Chip Cummings Field added a pressbox, with a film deck, for the 2007 season. The new building includes seating for print/electronic media, public address announcer, music operator and scoreboard operator.
ChipCummingsFieldSeatingWeb
Permanent bleacher seating was one of the several improvements made at Chip Cummings Field for the 2007 campaign. Seating capacity is 511, but the surrounding grounds can hold up to 1,000 spectators.
Date: 05/23/08
Permanent bleacher seating was one of the several improvements made at Chip Cummings Field for the 2007 campaign. Seating capacity is 511, but the surrounding grounds can hold up to 1,000 spectators.
ChipCummingsFieldPlaqueWeb
Thomas "Chip" Cummings '56, a 1988 inductee to the Cardinal Sports Hall of Fame, made it possible for SUNY Plattsburgh to reinstate baseball as a varsity sport in 2002.
Date: 05/23/08
Thomas "Chip" Cummings '56, a 1988 inductee to the Cardinal Sports Hall of Fame, made it possible for SUNY Plattsburgh to reinstate baseball as a varsity sport in 2002.
StaffordArenaRenovations
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse. Workers have removed the dasher boards/glass, bleachers and wooden pressbox. Images taken May 26-30, 2008.
Date: 05/29/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse. Workers have removed the dasher boards/glass, bleachers and wooden pressbox. Images taken May 26-30, 2008.
StaffordArenaRenovations1
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse. Workers have removed the dasher boards/glass, bleachers and wooden pressbox. Images taken May 26-30, 2008.
Date: 05/29/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse. Workers have removed the dasher boards/glass, bleachers and wooden pressbox. Images taken May 26-30, 2008.
StaffordArenaRenovations2
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse. Workers have removed the dasher boards/glass, bleachers and wooden pressbox. Images taken May 26-30, 2008.
Date: 05/29/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse. Workers have removed the dasher boards/glass, bleachers and wooden pressbox. Images taken May 26-30, 2008.
StaffordArenaRenovations3
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse. Workers have removed the dasher boards/glass, bleachers and wooden pressbox. Images taken May 26-30, 2008.
Date: 05/29/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse. Workers have removed the dasher boards/glass, bleachers and wooden pressbox. Images taken May 26-30, 2008.
StaffordArenaRenovations4
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse. Workers have removed the dasher boards/glass, bleachers and wooden pressbox. Images taken May 26-30, 2008.
Date: 05/29/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse. Workers have removed the dasher boards/glass, bleachers and wooden pressbox. Images taken May 26-30, 2008.
StaffordArenaRenovations5
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse. Workers have removed the dasher boards/glass, bleachers and wooden pressbox. Images taken May 26-30, 2008.
Date: 05/29/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse. Workers have removed the dasher boards/glass, bleachers and wooden pressbox. Images taken May 26-30, 2008.
StaffordArenaRenovations6
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse. Workers have removed the dasher boards/glass, bleachers and wooden pressbox. Images taken May 26-30, 2008.
Date: 05/29/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse. Workers have removed the dasher boards/glass, bleachers and wooden pressbox. Images taken May 26-30, 2008.
StaffordArenaRenovations7
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse. Workers have removed the dasher boards/glass, bleachers and wooden pressbox. Images taken May 26-30, 2008.
Date: 05/29/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse. Workers have removed the dasher boards/glass, bleachers and wooden pressbox. Images taken May 26-30, 2008.
StaffordArenaRenovations8
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse. Workers have removed the dasher boards/glass, bleachers and wooden pressbox. Images taken May 26-30, 2008.
Date: 05/29/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse. Workers have removed the dasher boards/glass, bleachers and wooden pressbox. Images taken May 26-30, 2008.
MemorialHallExteriorWeb
Aerial view of Memorial Hall along Rugar Street, housing the Department of Sport&Wellness, swimming pool, fitness center, climbing wall, racquetball courts, classrooms and home to the Cardinal basketball and volleyball programs.
Date: 06/05/08
Aerial view of Memorial Hall along Rugar Street, housing the Department of Sport&Wellness, swimming pool, fitness center, climbing wall, racquetball courts, classrooms and home to the Cardinal basketball and volleyball programs.
MemorialFloorWeb
View of Memorial Hall court used for basketball and volleyball intercollegiate programs, intramurals and physical education classes. (Photo by Kerry Chapin, SUNY Plattsburgh Sports Information Office)
Date: 06/05/08
View of Memorial Hall court used for basketball and volleyball intercollegiate programs, intramurals and physical education classes. (Photo by Kerry Chapin, SUNY Plattsburgh Sports Information Office)
XCRugarWoodsCourse
Aerial view of the Plattsburgh State cross country course in Rugar Woods that winds between the Fieldhouse and Saranac River.
Date: 06/06/08
Aerial view of the Plattsburgh State cross country course in Rugar Woods that winds between the Fieldhouse and Saranac River.
StaffordArenaRenovations9
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of June 9-15, 2008.
Date: 06/09/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of June 9-15, 2008.
StaffordArenaRenovations10
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of June 9-15, 2008.
Date: 06/09/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of June 9-15, 2008.
StaffordArenaRenovations11
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of June 9-15, 2008.
Date: 06/09/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of June 9-15, 2008.
StaffordArenaRenovations12
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of June 9-15, 2008.
Date: 06/09/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of June 9-15, 2008.
StaffordArenaRenovations13
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of June 9-15, 2008.
Date: 06/09/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of June 9-15, 2008.
StaffordArenaRenovations14
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of June 9-15, 2008.
Date: 06/09/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of June 9-15, 2008.
MHKYNCAATrophyCase
Plattsburgh State men's hockey trophy case, located in the Fieldhouse Lobby, filled with NCAA tournament hardware.
Date: 06/09/08
Plattsburgh State men's hockey trophy case, located in the Fieldhouse Lobby, filled with NCAA tournament hardware.
MHKYAllAmericaWall
Located in the Fieldhouse Lobby hangs the Plattsburgh State men's hockey Wall of All-Americans as selected by the American Hockey Coaches Association.
Date: 06/09/08
Located in the Fieldhouse Lobby hangs the Plattsburgh State men's hockey Wall of All-Americans as selected by the American Hockey Coaches Association.
MemorialHallFront
Rugar Street-level view of Plattsburgh State Sport&Wellness facility Memorial Hall, which houses classrooms, varsity basketball and volleyball teams, swimming pool, locker rooms and coaches/administrative offices.
Date: 06/09/08
Rugar Street-level view of Plattsburgh State Sport&Wellness facility Memorial Hall, which houses classrooms, varsity basketball and volleyball teams, swimming pool, locker rooms and coaches/administrative offices.
MemorialHallSideEast
An east-side view, Plattsburgh State Sport&Wellness facility Memorial Hall is three stories high.
Date: 06/09/08
An east-side view, Plattsburgh State Sport&Wellness facility Memorial Hall is three stories high.
StaffordArenaArt
An artist's rendering of the renovated Stafford Ice Arena, which will open for the 2008-09 with approximately 1,800 theatre-style seats.
Date: 06/24/08
An artist's rendering of the renovated Stafford Ice Arena, which will open for the 2008-09 with approximately 1,800 theatre-style seats.
StaffordConstruction
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 7-11, 2008. Concrete and steel work has started that will provide support for the spectator seating on the east side of the Arena.
Date: 07/08/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 7-11, 2008. Concrete and steel work has started that will provide support for the spectator seating on the east side of the Arena.
StaffordConstruction2
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 7-11, 2008. Steel work has started that will provide support for the spectator seating on the east side of the Arena.
Date: 07/08/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 7-11, 2008. Steel work has started that will provide support for the spectator seating on the east side of the Arena.
StaffordConstruction3
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 7-11, 2008. Concrete and steel work for spectator seating has been erected on the west side.
Date: 07/08/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 7-11, 2008. Concrete and steel work for spectator seating has been erected on the west side.
StaffordConstruction4
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 7-11, 2008.
Date: 07/08/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 7-11, 2008.
StaffordConstruction5
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 7-11, 2008.
Date: 07/08/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 7-11, 2008.
StaffordConstruction6
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 7-11, 2008.
Date: 07/08/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 7-11, 2008.
StaffordConstruction7
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 7-11, 2008.
Date: 07/08/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 7-11, 2008.
StaffordConstruction8
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 7-11, 2008.
Date: 07/08/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 7-11, 2008.
StaffordRenovationsJuly2008
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 14-18, 2008.
Date: 07/18/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 14-18, 2008.
StaffordRenovations2July2008
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 14-18, 2008.
Date: 07/18/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 14-18, 2008.
StaffordRenovations3July2008
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 14-18, 2008.
Date: 07/18/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 14-18, 2008.
StaffordRenovations4July2008
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 14-18, 2008.
Date: 07/18/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 14-18, 2008.
StaffordRenovations5July2008
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 14-18, 2008.
Date: 07/18/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 14-18, 2008.
StaffordRenovations6July2008
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 14-18, 2008.
Date: 07/18/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 14-18, 2008.
StaffordRenovations7July2008
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 14-18, 2008.
Date: 07/18/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 14-18, 2008.
StaffordRenovations8July2008
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 14-18, 2008.
Date: 07/18/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 14-18, 2008.
StaffordRenovations9July2008
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 14-18, 2008.
Date: 07/18/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 14-18, 2008.
StaffordRenovations10July2008
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 14-18, 2008.
Date: 07/18/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 14-18, 2008.
StaffordRenovations11July2008
Date: 07/18/08
StaffordRenovations1July25
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 21-25, 2008.
Date: 07/25/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 21-25, 2008.
StaffordRenovations2July25
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 21-25, 2008.
Date: 07/25/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 21-25, 2008.
StaffordRenovations3July25
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 21-25, 2008.
Date: 07/25/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 21-25, 2008.
StaffordRenovations4July25
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 21-25, 2008.
Date: 07/25/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 21-25, 2008.
StaffordRenovations5July25
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 21-25, 2008.
Date: 07/25/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 21-25, 2008.
StaffordRenovations6July25
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 21-25, 2008.
Date: 07/25/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 21-25, 2008.
StaffordRenovations7July25
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 21-25, 2008.
Date: 07/25/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 21-25, 2008.
StaffordRenovations8July25
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 21-25, 2008.
Date: 07/25/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 21-25, 2008.
StaffordRenovations9July25
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 21-25, 2008.
Date: 07/25/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 21-25, 2008.
StaffordRenovations10July25
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 21-25, 2008.
Date: 07/25/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 21-25, 2008.
StaffordRenovations11July25
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 21-25, 2008.
Date: 07/25/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 21-25, 2008.
FieldhouseTennisCourts
Home of the Plattsburgh State women's varsity tennis team.
Date: 07/25/08
Home of the Plattsburgh State women's varsity tennis team.
FieldhouseTennisCourts2
Home of the Plattsburgh State women's varsity tennis team.
Date: 07/25/08
Home of the Plattsburgh State women's varsity tennis team.
StaffordRenovationsJuly308
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 28, 2008.
Date: 07/30/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 28, 2008.
StaffordRenovations1July308
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 28, 2008.
Date: 07/30/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 28, 2008.
StaffordRenovations2July308
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 28, 2008.
Date: 07/30/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 28, 2008.
StaffordRenovations3July308
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 28, 2008.
Date: 07/30/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 28, 2008.
StaffordRenovations4July308
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 28, 2008.
Date: 07/30/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 28, 2008.
StaffordRenovations5July308
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 28, 2008.
Date: 07/30/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 28, 2008.
StaffordRenovations6July308
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 28, 2008.
Date: 07/30/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 28, 2008.
StaffordRenovations7July308
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 28, 2008.
Date: 07/30/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 28, 2008.
StaffordRenovations8July308
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 28, 2008.
Date: 07/30/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 28, 2008.
StaffordRenovations9July308
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 28, 2008.
Date: 07/30/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 28, 2008.
StaffordRenovations10July308
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 28, 2008.
Date: 07/30/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 28, 2008.
StaffordRenovations11July308
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 28, 2008.
Date: 07/30/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 28, 2008.
StaffordRenovations12July308
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 28, 2008.
Date: 07/30/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 28, 2008.
StaffordRenovations13July308
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 28, 2008.
Date: 07/30/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of July 28, 2008.
FieldHouseTennisCourts
View of Field House Tennis Courts at Plattsburgh State.
Date: 07/30/08
View of Field House Tennis Courts at Plattsburgh State.
StaffordAug122008
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Aug. 11, 2008.
Date: 08/12/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Aug. 11, 2008.
Stafford1Aug122008
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Aug. 11, 2008.
Date: 08/12/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Aug. 11, 2008.
Stafford2Aug122008
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Aug. 11, 2008.
Date: 08/12/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Aug. 11, 2008.
Stafford3Aug122008
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Aug. 11, 2008.
Date: 08/12/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Aug. 11, 2008.
Stafford4Aug122008
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Aug. 11, 2008.
Date: 08/12/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Aug. 11, 2008.
Stafford5Aug122008
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Aug. 11, 2008.
Date: 08/12/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Aug. 11, 2008.
Stafford6Aug122008
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Aug. 11, 2008.
Date: 08/12/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Aug. 11, 2008.
Stafford7Aug122008
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Aug. 11, 2008.
Date: 08/12/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Aug. 11, 2008.
Stafford8Aug122008
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Aug. 11, 2008.
Date: 08/12/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Aug. 11, 2008.
Stafford9Aug122008
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Aug. 11, 2008.
Date: 08/12/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Aug. 11, 2008.
StaffordRenovationsAug26Web
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Aug. 25, 2008.
Date: 08/26/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Aug. 25, 2008.
StaffordRenovations1Aug26Web
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Aug. 25, 2008. Work begins on expanding both ends of the pressbox.
Date: 08/26/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Aug. 25, 2008. Work begins on expanding both ends of the pressbox.
StaffordRenovations2Aug26Web
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Aug. 25, 2008.
Date: 08/26/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Aug. 25, 2008.
StaffordRenovations3Aug26Web
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Aug. 25, 2008.
Date: 08/26/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Aug. 25, 2008.
StaffordRenovations4Aug26Web
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Aug. 25, 2008.
Date: 08/26/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Aug. 25, 2008.
StaffordRenovations5Aug26Web
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Aug. 25, 2008.
Date: 08/26/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Aug. 25, 2008.
StaffordRenovations6Aug26Web
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Aug. 25, 2008.
Date: 08/26/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Aug. 25, 2008.
StaffordRenovations7Aug26Web
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Aug. 25, 2008.
Date: 08/26/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Aug. 25, 2008.
StaffordRenovations8Aug26Web
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Aug. 25, 2008.
Date: 08/26/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Aug. 25, 2008.
StaffordRenovations9Aug26Web
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Aug. 25, 2008.
Date: 08/26/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Aug. 25, 2008.
StaffordRenovations10Aug26Web
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Aug. 25, 2008.
Date: 08/26/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Aug. 25, 2008.
StaffordRenovations11Aug26Web
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Aug. 25, 2008.
Date: 08/26/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Aug. 25, 2008.
StaffordRenovations12Aug26Web
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Aug. 25, 2008.
Date: 08/26/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Aug. 25, 2008.
arena1
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Sep. 8, 2008. (Photo courtesy of Keith Tyo)
Date: 09/04/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Sep. 8, 2008. (Photo courtesy of Keith Tyo)
arena2
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Sep. 8, 2008. (Photo courtesy of Keith Tyo)
Date: 09/04/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Sep. 8, 2008. (Photo courtesy of Keith Tyo)
arena3
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Sep. 8, 2008. (Photo courtesy of Keith Tyo)
Date: 09/04/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Sep. 8, 2008. (Photo courtesy of Keith Tyo)
StaffordArenaSep7
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Sep. 14, 2008.
Date: 09/07/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Sep. 14, 2008.
StaffordArena1Sep7
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Sep. 14, 2008.
Date: 09/07/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Sep. 14, 2008.
StaffordArena2Sep7
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Sep. 14, 2008.
Date: 09/07/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Sep. 14, 2008.
StaffordArena3Sep7
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Sep. 14, 2008.
Date: 09/07/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Sep. 14, 2008.
StaffordArena4Sep7
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Sep. 14, 2008.
Date: 09/07/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Sep. 14, 2008.
StaffordArena5Sep7
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Sep. 14, 2008.
Date: 09/07/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Sep. 14, 2008.
StaffordArena6Sep7
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Sep. 14, 2008.
Date: 09/07/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Sep. 14, 2008.
StaffordArena7Sep7
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Sep. 14, 2008.
Date: 09/07/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Sep. 14, 2008.
StaffordArena8Sep7
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Sep. 14, 2008.
Date: 09/07/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Sep. 14, 2008.
StaffordArena9Sep7
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Sep. 14, 2008.
Date: 09/07/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Sep. 14, 2008.
StaffordArena10Sep7
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Sep. 14, 2008.
Date: 09/07/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Sep. 14, 2008.
StaffordArena11Sep7
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Sep. 14, 2008.
Date: 09/07/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Sep. 14, 2008.
StaffordRenovationsSept18
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Sep. 21, 2008.
Date: 09/18/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Sep. 21, 2008.
StaffordRenovations1Sept18
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Sep. 21, 2008.
Date: 09/18/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Sep. 21, 2008.
StaffordRenovations2Sept18
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Sep. 21, 2008.
Date: 09/18/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Sep. 21, 2008.
StaffordRenovations3Sept18
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Sep. 21, 2008.
Date: 09/18/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Sep. 21, 2008.
StaffordRenovations4Sept18
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Sep. 21, 2008.
Date: 09/18/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Sep. 21, 2008.
StaffordRenovations5Sept18
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Sep. 21, 2008.
Date: 09/18/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Sep. 21, 2008.
StaffordRenovations6Sept18
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Sep. 21, 2008.
Date: 09/18/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Sep. 21, 2008.
StaffordRenovations7Sept18
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Sep. 21, 2008.
Date: 09/18/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Sep. 21, 2008.
StaffordRenovations8Sept18
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Sep. 21, 2008.
Date: 09/18/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Sep. 21, 2008.
StaffordRenovations9Sept18
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Sep. 21, 2008.
Date: 09/18/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Sep. 21, 2008.
StaffordRenovations10Sept18
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Sep. 21, 2008.
Date: 09/18/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Sep. 21, 2008.
StaffordRenovations11Sept18
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Sep. 21, 2008.
Date: 09/18/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Sep. 21, 2008.
StaffordRenovations12Sept18
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Sep. 21, 2008.
Date: 09/18/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Sep. 21, 2008.
StaffordRenovations13Sept18
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Sep. 21, 2008.
Date: 09/18/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Sep. 21, 2008.
StaffordRenovations14Sept18
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Sep. 21, 2008.
Date: 09/18/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Sep. 21, 2008.
StaffordRenovations15Sept18
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Sep. 21, 2008.
Date: 09/18/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Sep. 21, 2008.
StaffordRenovations16Sept18
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Sep. 21, 2008.
Date: 09/18/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Sep. 21, 2008.
StaffordRenovations17Sept18
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Sep. 21, 2008.
Date: 09/18/08
Stafford Ice Arena renovations at the Plattsburgh State Fieldhouse continue through the week of Sep. 21, 2008.
StaffordArenaRenovated4Web
The penalty boxes were moved opposite the team benches with the completion of Stafford Arena renovations in 2008. (SUNY Plattsburgh Athletics Photo by Patrick Stewart.)
Date: 07/02/09
The penalty boxes were moved opposite the team benches with the completion of Stafford Arena renovations in 2008. (SUNY Plattsburgh Athletics Photo by Patrick Stewart.)
StaffordArenaRenovated3Web
Stafford Arena has more functionality and is easily-navigated after the renovations in summer 2008. (SUNY Plattsburgh Athletics Photo by Patrick Stewart.)
Date: 07/02/09
Stafford Arena has more functionality and is easily-navigated after the renovations in summer 2008. (SUNY Plattsburgh Athletics Photo by Patrick Stewart.)
StaffordArenaRenovated2Web
Refurbished Stafford Arena has theatre-style, chairback seating for 1,517. (SUNY Plattsburgh Athletics Photo by Patrick Stewart.)
Date: 07/02/09
Refurbished Stafford Arena has theatre-style, chairback seating for 1,517. (SUNY Plattsburgh Athletics Photo by Patrick Stewart.)
StaffordArenaRenovated1Web
Spectators have a closer look at the action on the west end of Stafford Arena, where the main entrance is located.(SUNY Plattsburgh Athletics Photo by Patrick Stewart.)
Date: 07/02/09
Spectators have a closer look at the action on the west end of Stafford Arena, where the main entrance is located.(SUNY Plattsburgh Athletics Photo by Patrick Stewart.)
StaffordArenaPressBoxWeb
The Stafford Arena pressbox has a state-of-the-art sound system, positions for radio and TV crews, ample space for media and is wired for the Internet. (SUNY Plattsburgh Athletics Photo by Patrick Stewart.)
Date: 07/02/09
The Stafford Arena pressbox has a state-of-the-art sound system, positions for radio and TV crews, ample space for media and is wired for the Internet. (SUNY Plattsburgh Athletics Photo by Patrick Stewart.)
StaffordArenaRenovated5Web
The refurbished Stafford Arena has a capacity of 1,924 fans; pro-style tempered, seamless glass; new dasher boards; 40-seat pressbox; Ethernet and wireless connections; and easier navigation. The $2.1 million renovation was completed in time for the 2008-
Date: 07/02/09
The refurbished Stafford Arena has a capacity of 1,924 fans; pro-style tempered, seamless glass; new dasher boards; 40-seat pressbox; Ethernet and wireless connections; and easier navigation. The $2.1 million renovation was completed in time for the 2008-09 season.(Photo courtesy of Bill Roberts.)